Structural Engineering  
Static and Dynamics of Structures
Structural Monitoring and Adaptive Structures
Advanced Materials for Construction
Cable Systems
Strengthening and Seismic Retrofitting
Timber Engineering

Testing Hall

The Empa testing hall with its multiple functionality is an important corner stone of our testing and research activities. A wide range of test machines are installed in our testing hall.

 

Features of the testing hall and the strong floor:

Testing Hall height
  • Dimension: 12 x 40.8 m, the highest level to be passed by crane is 13.5 m
  • Several crane ways are available with loading capacities up to 100 kN.
Outline of Testing Hall
  • 385 anchorages positions
  • Loading capacity per anchorage point: 2000 kN tension or compression as well as 2000 kN shear.

 

Testing Hall facilities:
Testing Hall with strong floor
  • Standardized steel supports or beams (Mecano like) can be arranged for various test geometries.
  • A wide range of testing machines for applying forces of up to 20 MN as well as a servo hydraulic with up to 1000 kN tension / compression cylinder.

New

Intelligent cable-stayed bridge - a research laboratory

This bridge is creating a link between the often highly simplified laboratory experiments and the more complex, real world structures.

 

Cable-stayed Bridge

Topics:

  • Structural dynamics: passive, semi-active and active vibration mitigation, health-monitoring, self diagnostics
  • Integrated sensing: fiber optic sensors, piezoelectric fiber sensors
  • Advanced materials as structural elements (glass- and carbon-fiber reinforced polymers)

 

EMPA  is well equiped for future challenges targets.

We carry out tests and research orders for civil engineering applications, car and machine as well as air- and space technology manufacturers.

 

Responsible are:

Heinrich Lippuner          Head of Testing Hall

Bruno Maag                  Techn. Assistant

Bruno Dürst                   Techn. Assistant

Guiseppe Cuccuru          Techn. Assistant

Concrete Manufacturing Facility
Concrete Manufacturing Facility

 

Concrete Mixing Plant
Concrete Mixing Plant

 

Our automatic concrete mixing plant takes charges up to 0.75m3

Responsible is:

Werner Studer      Techn. Assistant

back  Links  Send article  print view